When we last visited 289 13th Street there was a Stop Work Order posted out front on the construction fence. This is how the excavation site looked back then.


This is how it looks today. Not much has changed over the past 4 months.
UNLUCKY 289 13th St.

Description of Violation:
FAILURE TO ADEQUATELY SUPPORT ADJOINING GROUNDS AND STRUCTURES AFFECTED BY EXCAVATION. NOTED: AT TIME OF INSPECTION AN EXCAVATION SITE WITH
A SHEER CUT OF APPROX. 7' TO 6' DEEP AND NO PROTECTION PROVIDED (NEO)M

Re: BOROUGH COMMISSIONER HAS ISSUED A 10-DAY LETTER OF INTENT.TO REVOKE APPLICATION 302359301 ON 11/09/07 ISSUE DOB STOP ORDER AND NOTE THE PERCENTAGE OF WORK COMPLETED SO FAR ON VIOLATION AND COMPLAINT
No comments:
Post a Comment