Monday, March 19, 2007

Hole

As the excavator begins removing the ground, some 300,000 cubic feet before it's all over, the steel foundation piles are being revealed. So far I can't report hearing any melancholy cries, loud weeping, or gnashing of teeth coming from the pit.


















The earth moves first along the rear lot line, pictured above.












Pictured above. The Eighth Avenue line. The Baptist church is on the far right. 1504 8th Ave. is on the far left.








No comments: