Two additional boring samples taken yesterday and today along the 15th St. side of 1502 8th Avenue. This is the corner building attached to the vacated 1504 8th Avenue. Most likely these boring tests have been ordered for remedial purposes related to adjacent excavation work. Subsurface voids perhaps drawing the soil away from the foundation?
1 comment:
Thanks for sharing the such information with us.
Post a Comment