Saturday, May 01, 2010

396 15th Street For Sale



















A partially restored relic from the South Slope's good ol' manufacturing days goes on sale.

One of the last remaining manufacturing shop spaces left standing on our gentrified R6B zoned 15th Street. Located between 7th and 8th Avenues, it is now being sold through Marcus & Millichap.

The two story garage space with partial cellar is just across the street from the new YMCA Armory Sports Facility and, unfortunately, next door to the very stalled/abandoned condo project at 400 15th Street .



It was during excavation for this new condo that massive cracks formed through out 396 15th Street. The entire 100' masonry sidewall and 25' wide front facade broke off from the original building, and has since been replaced with a like colored brick.. There is a Stop Work Order Violation on the property dating back to the time of its reconstruction. Apparently the DOB objected to the contractor using the criss-crossed metal shoring system (seen in the photo) to support the floor/roof during the foundation underpinning and wall rebuilding process instead of the wood timbers specified in the approved plans... Anyway, the work appears to be finished.




Emergency bracing installed against 396 after it begins to move.













01/03/2007 A3 FULL STOP WORK ORDER SERVED 1934 01/03/2007


WORK DOES NOT CONFORM TO PLANS302049433 STEEL SHORING BEING
01/04/2007 A3 FULL STOP WORK ORDER SERVED 0253 01/03/2007


WORK DOES NOT CONFORM TO PLANS302049433 STEEL SHORING BEING USED, PLANS CALLS FOR TIMBER SHORING
01/19/2007 L1 PARTIAL STOP WORK ORDER 0253 01/18/2007


PARTIAL LIFT TO INSTALL SHORING AND BRACING OSHORING BEING USED, PLANS CALLS FOR TIMBER SHORING
01/19/2007 L1 PARTIAL STOP WORK ORDER 1934 01/18/2007


PARTIAL LIFT TO INSTALL SHORING AND BRACING ONLY
03/05/2007 L2 STOP WORK ORDER FULLY RESCINDED 1934 03/05/2007


FULL LIFT BASED ON PLANS 3026646 3/2/7 APPROVED GALLAGHER 3/ 2/7
06/23/2007 L1 PARTIAL STOP WORK ORDER 1934 06/22/2007


PARTIAL LIFT TO COMPLETE FOUNDATION WALL AT SIDE INSTALL MAT SLAB FULL LIFT MUST BE OK BY IM