Tuesday, February 05, 2008

406 15th St. Iron Work Third Floor













The iron work is extended upwards after each lower floor has been decked and the concrete poured and finished. Not so confident about the way the holes have been drilled. Looks like some holes have blown out over the edge of the column. Actually who is responsible for inspecting the iron, the Engineer? The Self-Certifing Architect? The General Contractor? The Buildings Department? Below you can click on the photos to see the details and judge for yourself.